Ku-ring-gai s94A Contributions Plan 2015 (Section 94A)

There are two contributions plans currently active in the Ku-ring-gai Council Area.  This page relates to the s94A contributions plan called Ku-ring-gai s94A Contributions Plan 2015.  This type of plan is also known as an ‘indirect’ plan or a ‘percentage levy’ plan.

There is also a s94 contributions plan active in the Ku-ring-gai area which applies to different types of development and funds a separate works programme.  It is called Ku-ring-gai Contributions Plan 2010.
Ku-ring-gai s94A Contributions Plan 2015 came into effect on Easter Sunday 27 March 2016.  There is a phase in period as it will be applied to all relevant DAs and CDCs lodged or otherwise notified after that date.

Section 94A maximum percentage

The maximum percentage of contributions based on the cost of developments is set by legislation and adopted within the s94A Contributions Plan as follows:

Proposed cost of the development

Maximum percentage of the levy 

 Up to $100,000  Nil (0%)
 $100,001 - $200,000  0.5 percent (0.5%)
 More than $200,000  1.0 percent (1%)

Application of s94A

It is important to note that the established s94 plan, Ku-ring-gai Contributions Plan 2010, is not affected by the introduction of this complementary and mutually exclusive document.  Any development that is subject to direct s94 contributions under Ku-ring-gai Contributions Plan 2010 continues to be so. 

Indirect contributions under s94A relate only to development that is not subject to s94 contributions under Ku-ring-gai Contributions Plan 2010.  These contributions also support a completely separate works program.

Ku-ring-gai S94A Contributions Plan 2015

Ku-ring-gai S94A Contributions Plan 2015 can be downloaded as a single file. Please refer carefully to the sections that define the development to which Ku-ring-gai S94A Contributions Plan 2015 applies. As part of the documentation submitted to Council as part of any DA or CDC, it will be necessary to include either a cost report or a QS report (as applicable) from the templates found in Schedules One or Two of Ku-ring-gai S94A Contributions Plan 2015.

View the Ku-ring-gai S94A Contributions Plan 2015 (pdf. 1MB)

Further information

If you wish to proceed with a Development Application or Complying Development Certificate, the following pages may be of interest: